Versa Pedestrian Gate

(0 reviews) | Write your review

Model# MG

Versa pedestrian gates are specially welded for durability and arrive assembled. Includes hinges and a latch.
Ships in 2 business days
In Stock

Register Zipcode or login for
shipping estimate

$67 00/ ea
Earn
3.8% Instant Rebate

Earn more rebates on your next purchase. Join SONCO Club for free and start saving today!

$67 00/ ea
Add To Cart
Add To Quote
Overview Reviews

   

Versa Pedestrian Gate

For your construction site's temporary fencing needs, you require durability, ease of use, and reliability. The Versa pedestrian gate meets these criteria seamlessly.

Featuring robust welds and a corrosion-resistant zinc coating, Versa chain-link pedestrian gates ensure both security.

   

   

Chain-Link Pedestrian Gates: a Valuable Component on the Jobsite

   

  

One-year manufacturer warranty.

  

  

Compatible with water barriers and chain-link fence panels.

  

  

Pre-galvanized finish that resists corrosion.

  

  

Tension bars and bands for enhanced durability.

  

   

Quality-Constructed Pedestrian Gate for Fencing, Water Barriers, & More

Wide compatibility, impressive durability. Versa pedestrian gates come assembled and ready to integrate into perimeters. Includes tension bars and bands, zinc-rich welder's paint at the joints, heavy-duty galvanized hinges, and one gate latch.

   

   

PRO TIP:
Jersey Barriers & Chain Link Fence Toppers

Reinforce your perimeter using our water barricades with chain-link fence topper.

These barricades are compatible with the Versa Pedestrian Gate and are perfect for multiphase highway projects, roadblocks, construction zones, equipment storage, parking segmentation, and pedestrian control.

   

   

Resources

Versa Chain-Link Panels for Temp Fence Projects | SONCO

Meet SONCO’s tallest and most rugged chain-link panels — popular for construction sites, major event venues, building projects and dozens of other applications.

Our Fence Gate Lineup Controls Access & Secures Assets

Security always takes top priority when you are staging people and assets for a building project or big event.

   

Q&A Reviews
Ask A Question
Reviews Reviews